Union Pacific R Co v. Locomotive Engineers and Trainmen Gen Comm of
558 U.S. 67
Decision date: 2009-12-08
OCTOBER TERM, 2009
67
Syllabus
UNION PACIFIC RAILROAD CO.
v.
BROTHERHOOD
OF LOCOMOTIVE ENGINEERS AND TRAINMEN
GENERAL COMMITTEE OF ADJUSTMENT,
CENTRAL REGION
certiorari to the united states court of appeals for the seventh circuit
No. 08–604. Argued October 7, 2009—Decided December 8, 2009 The Railway Labor Act (RLA or Act) was enacted to promote peaceful and efficient resolution of labor disputes. As amended, the Act man dates arbitration of “minor disputes” before panels composed of two representatives of labor and two of industry, with a neutral referee as tiebreaker.
Union Pacific
R.
Co.
v.
Price,
360 U. S. 601, 610–613. To supply arbitrators, Congress established the National Railroad Adjust ment Board (NRAB or Board), a board of 34 private persons represent ing labor and industry in equal numbers. 45 U. S. C. § 153 First (a).
Before resorting to arbitration, employees and carriers must exhaust the grievance procedures in their collective-bargaining agreement (hereinafter CBA), see § 153 First (i), a stage known as “on-property” proceedings. As a final prearbitration step, the parties must attempt settlement “in conference” between representatives of the carrier and the grievant-employee. § 152 Second, Sixth. The RLA contains in structions concerning the place and time of conferences, but does not “supersede the provisions of any agreement (as to conferences) . . . be tween the parties,” § 152 Sixth; in common practice the conference may be as informal as a telephone conversation. If the parties fail to achieve resolution, either may refer the matter to the NRAB. § 153 First (i).
Submissions to the Board must include “a full statement of the facts and all supporting data bearing upon the disputes.” Ibid.
Parties may seek court review of an NRAB panel order on one or more stated grounds: “failure . . . to comply with the requirements of [the RLA], . . . failure of the order to conform, or confine itself, to matters within the scope of the division’s jurisdiction, or . . . fraud or corruption by a mem ber of the division making the order.” § 153 First (q). Courts of Ap peals have divided on whether, in addition to the statutory grounds for judicial review stated in § 153 First (q), courts may review NRAB proceedings for due process violations.
After petitioner Union Pacific Railroad Co. (hereinafter Carrier) charged five of its employees with disciplinary violations, their union (hereinafter Union) initiated grievance proceedings pursuant to the
68 UNION PACIFIC R. CO.
v.
LOCOMOTIVE ENGINEERS
Syllabus CBA. The Union asserts that the parties conferenced all five disputes and the Carrier concedes that they conferenced at least two. Dissatis fied with the outcome of the on-property proceedings, the Union sought arbitration before the NRAB’s First Division. Both parties filed sub missions in the five cases, but neither mentioned conferencing as a dis puted matter. Yet, in each case, both parties necessarily knew whether the Union and the Carrier had conferred; and the Board’s governing rule, published in Circular One, which prescribes Board procedures, in structs carriers and employees to “set forth all relevant, argumentative facts,” 29 CFR § 301.5(d), (e). Just prior to the hearing, one of the arbi tration panel’s industry representatives objected, sua
sponte,
that the on-property record included no proof of conferencing. The Carrier thereafter embraced that objection. The referee allowed the Union to submit evidence of conferencing. The Union did so, but it maintained that the proof-of-conferencing issue was untimely raised, indeed for feited, as the Carrier had not objected before the date set for argument.
The panel, in five identical decisions, dismissed the petitions for want of jurisdiction. The record could not be supplemented to meet the no proof-of-conferencing objection, the panel reasoned, for as an appellate tribunal, the panel was not empowered to consider de
novo
evidence and arguments. The Union sought review in the Federal District Court, which affirmed the Board’s decision. On appeal, the Seventh Circuit observed that the “single question” at issue was whether written docu mentation of the conference in the on-property record was a necessary prerequisite to NRAB arbitration, and determined that there was no such prerequisite in the statute or rules. But instead of resting its decision on the Union’s primary, statute-based argument—that the panel erred in ruling that it lacked jurisdiction over the cases—it re versed on the ground that the NRAB’s proceedings were incompatible with due process.
Held:
1.
The Seventh Circuit erred in resolving the Union’s appeal under a constitutional, rather than a statutory, headline. This Court granted certiorari to address whether NRAB orders may be set aside for failure to comply with due process notwithstanding § 153 First (q)’s limited grounds for review. But so long as a respondent does not “seek to modify the judgment below,” true here, the respondent may “rely upon any matter appearing in the record in support of the judgment.” Blum
v.
Bacon,
457 U. S. 132, 137, n. 5. The Seventh Circuit understood that the Union had pressed “statutory and constitutional” arguments, but observed that both arguments homed in on a “single question”: Is writ ten documentation of the conference in the on-property record a neces
Cite as: 558 U. S. 67 (2009)
69
Syllabus sary prerequisite to NRAB arbitration? Answering this “single ques tion” in the negative, the Seventh Circuit effectively resolved the Union’s core complaint. Because nothing in the Act elevates to jurisdic tional status the obligation to conference minor disputes or to prove conferencing, a negative answer to the “single question” leaves no doubt about the Union’s entitlement, in accord with § 153 First (q), to vacation of the Board’s orders. Given this statutory ground for relief, there is no due process issue alive in this case, and no warrant to answer a question that may be consequential in another case. Nevertheless, the grant of certiorari here enables this Court to reduce confusion, clouding court as well as Board decisions, over matters properly typed “jurisdic tional.” Pp. 79–81.
2.
Congress authorized the Board to prescribe rules for presenting and processing claims, § 153 First (v), but Congress alone controls the Board’s jurisdiction. By refusing to adjudicate the instant cases on the false premise that it lacked “jurisdiction” to hear them, the NRAB panel failed “to conform, or confine itself, to matters [Congress placed] within the scope of [NRAB] jurisdiction,” § 153 First (q). Pp. 81–86. (a) Not all mandatory “prescriptions, however emphatic, ‘are . . . properly typed “jurisdictional.” ’ ” Arbaugh
v.
Y&
HC o r p . ,
546 U. S.
500, 510. Subject-matter jurisdiction properly comprehended refers to a tribunal’s “ ‘power to hear a case,’ ” and “ ‘can never be forfeited or waived.’ ” Id.,
at 514. In contrast, a “claim-processing rule” does not reduce a tribunal’s adjudicatory domain and is ordinarily “forfeited if the party asserting the rule waits too long to raise the point.” Kontrick
Ryan,
540 U. S. 443, 456. For example, this Court has held nonjurisdic tional and forfeitable the provision in Title VII of the Civil Rights Act of 1964 requiring complainants to file a timely discrimination charge with the Equal Employment Opportunity Commission (EEOC) before proceeding to court, Zipes
v.
Trans World Airlines, Inc.,
455 U. S. 385,
393.
In contrast, the Court has reaffirmed the jurisdictional character of 28 U. S. C. § 2107(a)’s time limitation for filing a notice of appeal.
551 U. S. 205, 209–211. Here, the requirement that parties to minor disputes, as a last chance prearbitration, attempt settle ment “in conference” is imposed on carriers and grievants alike, but satisfaction of that obligation does not condition the Board’s adjudica tory authority, which extends to “all disputes between carriers and their employees ‘growing out of grievances or out of the interpretation or application of agreements concerning rates of pay, rules, or working conditions . . . ,’ ” Slocum
v.
Delaware,
L.
&
W .
R.
Co.,
339 U. S. 239, 240
(quoting § 153 First (i)). When a CBA’s grievance procedure has not been followed, resort to the Board would ordinarily be objectionable as premature, but the conference requirement is independent of the CBA
70 UNION PACIFIC R. CO.
v.
LOCOMOTIVE ENGINEERS
Syllabus process. Rooted in § 152, the RLA’s “[g]eneral duties” section, and not moored to the NRAB’s “[e]stablishment[,] . . . powers[,] and duties” set out in § 153 First, conferencing is often informal in practice, and is no more “jurisdictional” than is the presuit resort to the EEOC held nonju risdictional and forfeitable in Zipes.
And if the conference requirement is not “jurisdictional,” then failure initially to submit proof of conferenc ing cannot be of that genre. And although the Carrier alleges that NRAB decisions support characterizing conferencing as jurisdictional, if the NRAB lacks authority to define its panels’ jurisdiction, surely the panels themselves lack that authority. Furthermore, NRAB panels have variously addressed the matter. Pp. 81–85. (b) Neither the RLA nor Circular One could plausibly be read to require, as a prerequisite to the NRAB’s exercise of jurisdiction, submis sion of proof of conferencing. Instructions on party submissions are claim-processing, not jurisdictional, rules. The Board itself has recog nized that conferencing may not be a “question in dispute,” and when that is so, proof thereof need not accompany party submissions. It makes sense to exclude at the arbitration stage newly presented “data” supporting the employee’s grievance, 29 CFR § 301.5(d)—evi dence the carrier had no opportunity to consider prearbitration. But conferencing is not a fact bearing on the merits of a grievance. More over, the RLA respects the parties’ right to order for themselves the conference procedures they will follow. See 45 U. S. C. § 152 Sixth.
Pp. 85–86.
522 F. 3d 746, affirmed.
Ginsburg, J., delivered the opinion for a unanimous Court.
J .
Scott Ballenger argued the cause for petitioner. With him on the briefs were Maureen
E.
Mahoney, Melissa
B.
Arbus, James
C.
Knapp, Jr.,
J .
Michael Hemmer, Patricia
O.
Kiscoan, and Donald
J .
Munro.
Thomas
H.
Geoghegan argued the cause and filed a brief for respondent.* * Peter Buscemi,
Harry
A.
Riss etto, Jona than
C.
Fritts, and Joanna
L.
Moorhead
filed a brief for the National Railway Labor Conference et al. as amici
curiae urging reversal.
Briefs of amici curiae
urging affirmance were filed for the American Federation of Labor and Congress of Industrial Organizations by Jona than
P .
Hiatt,
J
ames
B.
Coppess, and Laurence Gold;
and for the Broth erhood of Locomotive Engineers and Trainmen, National Division, by Harold
A.
Ross.
Cite as: 558 U. S. 67 (2009)
71
Opinion of the Court Justice Ginsburg delivered the opinion of the Court.
“It is most true that this Court will not take jurisdiction if it should not,” Chief Justice Marshall famously wrote, “but it is equally true, that it must take jurisdiction if it should ....W e have no more right to decline the exercise of jurisdiction which is given, than to usurp that which is not given.” Cohens
v.
Virginia, 6 Wheat. 264, 404 (1821); see Marshall v.
Marshall,
547 U. S. 293, 298–299 (2006). While Chief Justice Marshall’s statement bears “fine tuning,” there is surely a starting presumption that when jurisdiction is conferred, a court may not decline to exercise it. See R.
Fallon, J. Manning, D. Meltzer, & D. Shapiro, Hart & Wech sler’s The Federal Courts and the Federal System 1061–1062 (6th ed. 2009). The general rule applicable to courts also holds for administrative agencies directed by Congress to ad judicate particular controversies.
Congress vested in the National Railroad Adjustment Board (hereinafter NRAB or Board) jurisdiction to adjudi cate grievances of railroad employees that remain unset tled after pursuit of internal procedures. 45 U. S. C. § 153 First (h), (i). We consider in this case five nearly identi cal decisions of a panel of the NRAB dismissing employee claims “for lack of jurisdiction.” NRAB First Div. Award No. 26089 etc. (Mar. 15, 2005), App. to Pet. for Cert. 65a–107a, 69a (hereinafter Panel Decision). In each case, the panel de clared that a procedural rule raised by a panel member, un prompted by the parties, was “jurisdictional” in character and therefore commanded threshold dismissal.
The panel’s characterization, we hold, was misconceived.
Congress authorized the Board to prescribe rules for the presentation and processing of claims, § 153 First (v), but Congress alone controls the Board’s jurisdiction. By presuming authority to declare procedural rules “juris dictional,” the panel failed “to conform, or confine itself, to matters [Congress placed] within the scope of [NRAB] jurisdiction,” § 153 First (q). Because the panel was not
72 UNION PACIFIC R. CO.
v.
LOCOMOTIVE ENGINEERS
Opinion of the Court “without authority to assume jurisdiction over the [employ ees’] claim[s],” Panel Decision 72a, its dismissals lacked tena ble grounding. We therefore affirm the judgment of the Seventh Circuit setting aside the panel’s orders.
I
A
Concerned that labor disputes would lead to strikes bring ing railroads to a halt, Congress enacted the Railway Labor Act (RLA or Act), 44 Stat. 577, as amended, 45 U. S. C. § 151 et
seq.,
in 1926 to promote peaceful and efficient resolution of those disputes. See Union
Pacific
R.
Co.
v.
Price,
360 U. S.
601, 609 (1959); § 151a. The Act instructs labor and industry “to exert every reasonable effort to make and maintain agreements concerning rates of pay, rules, and working con ditions, and to settle all disputes, whether arising out of the application of such agreements or otherwise, in order to avoid any interruption to commerce or to the operation of any carrie r.... ” § 1 5 2 First; see Trainmen
v.
Jacksonville Terminal Co.,
394 U. S. 369, 377–378 (1969) (describing obli gation to pursue agreement as the “heart of the [RLA]”).
As part of its endeavor, Congress provided a framework for the settlement and voluntary arbitration of “minor disputes.” See Price,
360 U. S., at 609–610. (In the railroad industry, the term “minor disputes” means, primarily, “grievances arising from the application of collective bargaining agree ments to particular situations.” Id.,
at 609.)
1
Many railroads, however, resisted voluntary arbitration.
See id.,
at 610. Congress therefore amended the Act in 1934 (1934 Amendment) to mandate arbitration of minor disputes; under the altered scheme, arbitration occurs before panels
1
In contrast to minor disputes, which assume “the existence of a collec tive agreement,” major disputes are those “over the formation of collective agreements or efforts to secure them. . . . They look to the acquisition of rights for the future, not to assertion of rights claimed to have vested in the past.” E l g i n ,J .&E .R .C o .
v.
Burley,
325 U. S. 711, 723 (1945).
Cite as: 558 U. S. 67 (2009)
73
Opinion of the Court composed of two representatives of labor and two of indus try, with a neutral referee serving as tiebreaker. See id.,
at 610–613. To supply the representative arbitrators, Con gress established the NRAB, a board of 34 private persons representing labor and industry in equal numbers. § 153 First (a); see Trainmen
v.
Chicago
R.
&
I.
R.
Co.,
353 U. S.
30, 36–37 (1957).
2
Neutral referees, the RLA provides, shall be appointed by the representative arbitrators or, fa iling their agreement, by the National Mediation Board. § 153 First ( l ). The 1934 Amendment authorized the NRAB to adopt, at a one-time session in 1934, “such rules as it deems necessary to control proceedings,” § 153 First (v); the product of that rulemaking, codified at 29 CFR pt. 301 (2009), is known as Circular One.
In keeping with Congress’ aim to promote peaceful settle ment of minor disputes, the RLA requires employees and carriers, before resorting to arbitration, to exhaust the grievance procedures specified in the collective-bargaining agreement (hereinafter CBA). See 45 U. S. C. § 153 First (i). This stage of the dispute-resolution process is known as “on-property” proceedings. As a final prearbitra tion step, the Act directs parties to attempt settlement “in conference” between designated representatives of the car rier and the grievant-employee. § 152 Second, Sixth.
3
The
2
The RLA divides the NRAB into four divisions, each covering specified classes of railroad employees. § 153 First (h).
3
Central to the instant controversy, § 152 Second, Sixth read, in full:
“Second. Consideration of disputes by representatives.
“All disputes between a carrier or carriers and its or their employees shall be considered, and, if possible, decided, with all expedition, in confer ence between representatives designated and authorized so to confer, respectively, by the carrier or carriers and by the employees thereof in terested in the dispute.” “Sixth. Conference of representatives; time; place; private agreements.
“In case of a dispute between a carrier or carriers and its or their em ployees, arising out of grievances or out of the interpretation or applica tion of agreements concerning rates of pay, rules, or working conditions, it shall be the duty of the designated representative or representatives of
74 UNION PACIFIC R. CO.
v.
LOCOMOTIVE ENGINEERS
Opinion of the Court RLA contains instructions concerning the place and time of conferences, but specifies that the statute does not “super sede the provisions of any agreement (as to conferences) . . . in effect between the parties,” § 152 Sixth; it is undisputed that in common practice the conference may be as informal as a telephone conversation.
If the parties fail to achieve resolution “in the usual man ner up to and including the chief operating officer of the car rier designated to handle [minor] disputes,” either party may refer the matter to the NRAB. § 153 First (i). Submis sions to the Board must include “a full statement of the facts and all supporting data bearing upon the disputes.” Ibid. ; see 29 CFR § 301.5(d), (e) (submissions “must clearly and briefly set forth all relevant, argumentative facts, including all documentary evidence”). Arbitration is launched when the party referring the dispute files a notice of intent with the NRAB; after Board acknowledgment of the notice, the parties have 75 days to file simultaneous submissions.
NRAB, Uniform Rules of Procedure (rev. June 23, 2003).
In creating the scheme of mandatory arbitration superin tended by the NRAB, the 1934 Amendment largely “fore close[d] litigation” over minor disputes.
Price, 360 U. S., at 616; see Railway Conductors v.
Pitney,
326 U. S. 561, 566
(1946) (“Not only has Congres s... designated an agency peculiarly competent to handle [minor disputes], but . . . it also intended to leave a minimum responsibility to the courts.”). Congress did provide that an employee who ob- such carrier or carriers and of such employees, within ten days after the receipt of notice of a desire on the part of either party to confer in respect to such dispute, to specify a time and place at which such conference shall
be held:
Provided,
(1) That the place so specified shall be situated upon
the line of the carrier involved or as otherwise mutually agreed upon; and (2) that the time so specified shall allow the designated conferees reason able opportunity to reach such place of conference, but shall not exceed
twenty days from the receipt of such notice:
And provided further,
That nothing in this chapter shall be construed to supersede the provisions of any agreement (as to conferences) then in effect between the parties.”
Cite as: 558 U. S. 67 (2009)
75
Opinion of the Court tained a monetary award against a carrier could sue to en force it, and the court could either enforce the award or set it aside.
Price,
360 U. S., at 616; 45 U. S. C. § 153 First (p) (1934 ed.). In addition to that limited role, some Courts of Appeals, we noted in Price,
reviewed awards “claimed to result from a denial of due process of law.” 360 U. S., at 616 (citing Ellerd
v.
Southern Pacific
R.
Co., 241 F. 2d 541 (CA7 1957); Barnett v.
Pennsylvania-Reading Seashore Lines,
245
F.
2d 579, 582 (CA3 1957)).
In 1966, Congress again amended the scheme, this time to state grounds on which both employees and railroads could seek judicial review of NRAB orders. The governing provi sion, still in force, allows parties aggrieved by an NRAB panel order to petition for court review. 45 U. S. C. § 153 First (q) (2006 ed.). The provision instructs that “[o]n such review, the findings and order of the division shall be conclusive on the parties, except that the order . . . may be set aside, in whole or in part, or re manded . . . , for failure of the division to comply with the requirements of [the RLA], for failure of the order to conform, or confine itself, to matters within the scope of the division’s jurisdiction, or for fraud or corruption by a member of the division making the order.” Courts of Appeals have divided on whether this provision precludes judicial review of NRAB proceedings for due proc ess violations. Compare, e.
g., Shafii v.
PLC
British Air ways, 22 F. 3d 59, 64 (CA2 1994) (review available), and Edel man
v.
Western Airlines, Inc., 892 F. 2d 839, 847 (CA9 1989) (same), with Kinross
v.
Utah
R.
Co., 362 F. 3d 658, 662 (CA10 2004) (review precluded).
4 4
The disagreement stems from this Court’s per curiam opinion in Union Pacific
R.
Co.
v.
Sheehan,
439 U. S. 89 (1978). That case involved an NRAB decision turning on a time limitation contained in the governing CBA. Based on that limitation, the Board dismissed an employee’s claim.
The Tenth Circuit remanded the case to the NRAB on the ground that the Board had failed to consider the employee’s equitable tolling argument
76 UNION PACIFIC R. CO.
v.
LOCOMOTIVE ENGINEERS
Opinion of the Court
B
The instant matter arose when petitioner Union Pacific Railroad Co. (hereinafter Carrier) charged five of its employ ees with disciplinary violations. Their union, the Brother hood of Locomotive Engineers and Trainmen (hereinafter Union), initiated grievance proceedings pursuant to the CBA. The Union asserts that, following exhaustion of grievance proceedings, the parties conferenced all the dis putes; counsel for the Carrier conceded at argument that at least two of the disputes were conferenced, Tr. of Oral Arg. 7.
Dissatisfied with the outcome of the on-property proceed ings, the Union sought arbitration before the First Division of the NRAB. The Union and the Carrier, from early 2002 through 2003, filed simultaneous submissions in the five cases. In each submission, the Union included the notice of discipline (or discharge), the hearing transcript, and all ex hibits and evidence relating to the underlying adverse ac tions used in the grievance proceeding. Neither party men tioned conferencing as a disputed matter. Yet, in each case, both parties necessarily knew whether the Union and the Carrier had conferred, and the Board’s governing rule in structs carriers and employees to “set forth all relevant, argumentative facts,” 29 CFR § 301.5(d), (e).
On March 18, 2004, just prior to the hearing on the em ployees’ claims, one of the industry representatives on the arbitration panel raised an objection. Petition to Review and Vacate Awards and Orders of First Div. NRAB in No. 05–civ–2401 (ND Ill.), ¶ 20 (hereinafter Pet. to Review). and thereby violated due process. We summarily reversed, observing that the Board had in fact considered the plea for equitable tolling and explicitly rejected it.
Id.,
at 92. We added that if the Court of Appeals “intended to reverse the [NRAB’s] rejection of [the employee’s] equitable tolling argument,” then the court had exceeded the bounds § 153 First (q) placed on its review authority.
Id.,
at 93. In determining whether the CBA’s time limitation was tolled, we said, the Board “certainly was acting within its jurisdiction and in conformity with . . . the Act.” Ibid.
Cite as: 558 U. S. 67 (2009)
77
Opinion of the Court On his own initiative, unprompted by the Carrier, and in ex ecutive session, the industry representative asserted that the on-property record included no proof of conferencing.
See ibid.
The Carrier thereafter embraced the panel mem ber’s objection. The neutral referee informed the Union of the issue and adjourned the hearing, allowing the Union “to submit evidence that conferencing had in fact occurred.” See id.,
¶¶ 21–23. The Union did so, offering phone logs, handwritten notes, and correspondence between the parties as evidence of conferencing in each of the five cases.
E.
g.,
Panel Decision 67a–68a. From its first notice of the objec tion, however, the Union maintained that the proof-of conferencing issue was untimely raised, indeed forfeited, as the Carrier itself had not objected prior to the date set for argument of the cases.
E.
g., id., at 67a; Pet. to Review ¶¶ 22, 29, 30, 54.
On March 15, 2005, nearly one year after the question of conferencing first arose, the panel, in five identical decisions, dismissed the petitions for want of “authority to assume ju risdiction over the claim[s].” Panel Decision 72a. Citing Circular One, see supra,
at 73, and “the weight of arbitral precedent,” the panel stated that “the evidentiary record” must be deemed “closed once a Notice of Intent has been filed with the NRAB . . . .” Panel Decision 71a.
5
In ex plaining why the record could not be supplemented to meet the no-proof-of-conferencing objection, the panel emphasized that it was “an appellate tribunal, as opposed to one which is empowered to consider and rule on de
novo evidence and arguments.” Id., at 69a.
The two labor representatives dissented. The Carrier’s submissions, they reasoned, took no exception based on fail ure to conference or to prove conferencing; therefore, they concluded, under a “well settled principle governing the
5
The panel observed, however, that the records and notes offered by the Union, “on their face, may be regarded as supportive of its position that the conference[s] occurred.” Panel Decision 69a.
78 UNION PACIFIC R. CO.
v.
LOCOMOTIVE ENGINEERS
Opinion of the Court Board’s deliberations,” the Carrier had forfeited the issue.
Id.,
at 105a–106a. The dissenters urged that the Union had furnished evidence showing “the cases had all been con ferenced, even though the relevant Collective Bargaining Agreement [did] not require [conferencing].” Id.,
at 105a.
Dismissal of the claims, the dissenters charged, demon strated “the kind of gamesmanship that breeds contempt for the minor dispute process.” Id.,
at 107a.
The Union filed a petition for review in the United States District Court for the Northern District of Illi nois, asking the court to set aside the Board’s orders on the ground that the panel had “unlawfully held [it lacked] authority to as sume jurisdiction over [the] cases [absent] evidence of a ‘con ference’ between the parties in th e... ‘on-property’ record.” Pet. to Review ¶ 1. Nothing in the Act or the NRAB’s pro cedural rules, the Union maintained, mandated dismissal for failure to allege and prove conferencing in the Union’s origi nal submission.
Id.,
¶¶ 3, 4. By imposing, without war rant, “a technical pleading or evidentiary requirement” and elevating it to jurisdictional status, the Union charged, the panel had “egregiously violate[d] the Act,” id.,
¶3 , o r “fail[ed] to conform its jurisdiction to that required by . . . law,” id.,
¶ 4. Alternatively, the Union asserted that the panel violated procedural due process by entertaining the Carrier’s untimely objection, even though “the Carrier had failed to raise any objection as to lack of conferencing” in its submissions.
Id., ¶5 .
The District Court affirmed the Board’s orders. Address ing the Union’s argument that the no-proof-of-conferencing issue was untimely raised, the court accepted the panel’s de scription of the issue as “jurisdictional,” and noted the famil iar proposition that jurisdictional challenges may be raised at any stage of the proceedings. 432 F. Supp. 2d 768, 777, and n. 7 (2006).
On appeal, the Seventh Circuit recognized that the Union had presented its case “through both a statutory and consti
Cite as: 558 U. S. 67 (2009)
79
Opinion of the Court tutional framework.” 522 F. 3d 746, 750 (2008). The court observed, however, that “the essence of the conflict boils down to a single question: [I]s written documentation of the conference in the on-property record a necessary prerequi site to arbitration before the NRAB?” Ibid.
It then deter mined that there was no such prerequisite: “[N]o statute, regulation, or CBA,” the court concluded, “required the evi dence [of conferencing] to be presented in the on-property record.” Id.,
at 757–758. But instead of resting its decision on the Union’s primary, statute-based argument—that the panel erred in ruling that it lacked jurisdiction over the cases—the Court of Appeals reversed on the ground that the NRAB’s proceedings were incompatible with due process.
See id., at 750.
II
We granted the Carrier’s petition for certiorari, 555 U. S.
1169 (2009), which asked us to determine whether a review ing court may set aside NRAB orders for failure to comply with due process notwithstanding the limited grounds for review specified in § 153 First (q).
6
As earlier recounted, Courts of Appeals have divided on this issue. See supra,
at 75, and n. 4. Appearing as respondent in this Court, how ever, the Union urged affirmance of the Seventh Circuit’s judgment on an alternative ground. Reasserting the lead argument it had advanced in its petition for court review, see supra,
at 78, the Union maintained that the Board did not “conform, or confine itself, to matters within the scope of [its] jurisdiction,” § 153 First (q). Brief for Respondent 52–53.
In response, the Carrier stated that the Union’s alternative ground “presents a pure question of law that th[e] Court can and should resolve without need for remand.” Reply Brief 24, n. 9. We agree.
6
Quoted supra,
at 75, those grounds are “failure of the division to com ply with [RLA] requirements,” “failure of the order to conform, or confine itself, to matters within the scope of the division’s jurisdiction,” and “fraud or corruption by a member of the division making the order.”
80 UNION PACIFIC R. CO.
v.
LOCOMOTIVE ENGINEERS
Opinion of the Court So long as a respondent does not “seek to modify the judg ment below,” true here, “[i]t is well accepted” that the respondent may, “without filing a cross-appeal or cross- petition, . . . rely upon any matter appearing in the record in support of the judgment.” Blum
v.
Bacon,
457 U. S. 132,
137, n. 5 (1982). The Seventh Circuit, as just observed, see supra,
at 78–79, understood that the Union had pressed “statutory and constitutional” arguments, but also compre
hended that both arguments homed in on “a single question:
is written documentation of the conference in the on- property record a necessary prerequisite to arbitration be fore the NRAB?” 522 F. 3d, at 750. Answering this “sin gle question” in the negative, the Court of Appeals effectively resolved the Union’s core complaint. But, for reasons far from apparent, the court declared that “once we answer the key questio n..., adjudication of the due process claim is unavoidable.” Ibid.
The Seventh Circuit, we agree, asked the right question, but inappropriately placed its answer under a constitutional, rather than a statutory, headline. As the Court of Appeals determined, and as we discuss infra,
at 81–86, nothing in the Act elevates to jurisdictional status the obligation to confer ence minor disputes or to prove conferencing. That being so, the “unavoidable” conclusion, following from the Seventh Circuit’s “answer [to] the key question,” 522 F. 3d, at 750, is that the panel, in § 153 First (q)’s words, failed “to conform, or confine itself, to matters within the scope of [its] jurisdic tion.” The Carrier, although it sought a different outcome, was quite right to “urg[e] [the Court of Appeals] to consider the statutory claim before the constitutional one.” 522
F.
3d, at 750.
In short, a negative answer to the “single question” identi fied by the Court of Appeals leaves no doubt about the Union’s entitlement, in accord with § 153 First (q), to va cation of the Board’s orders. Given this statutory ground for relief, there is no due process issue alive in this case, and
Cite as: 558 U. S. 67 (2009)
81
Opinion of the Court no warrant to answer a question that may be consequential in another case: Absent grounds specified in § 153 First (q) for vacating a Board order, may a reviewing court set aside an NRAB adjudication for incompatibility with due process? An answer to that question must await a case in which the issue is genuinely in controversy.
7
In this case, however, our grant of certiorari enables us to address a mat ter of some importance: We can reduce confusion, clouding court as well as Board decisions, over matters properly typed “jurisdictional.”
III
A
Recognizing that the word “jurisdiction” has been used by courts, including this Court, to convey “many, too many, meanings,” Steel
Co.
v.
Citizens for Better Environment,
U.
S. 83, 90 (1998) (internal quotation marks omitted), we
have cautioned, in recent decisions, against profligate use of the term. Not all mandatory “prescriptions, however em phatic, are . . . properly typed jurisdictional,” we explained in Arbaugh
v. Y&HC o r p . ,
546 U. S. 500, 510 (2006) (inter nal quotation marks omitted). Subject-matter jurisdiction properly comprehended, we emphasized, refers to a tribu nal’s “power to hear a case,” a matter that “can never be forfeited or waived.” Id.,
at 514 (quoting United States v.
Cotton,
535 U. S. 625, 630 (2002)). In contrast, a “claim processing rule ,...e v e n i fu n a lterable on a party’s applica tion,” does not reduce the adjudicatory domain of a tribunal and is ordinarily “forfeited if the party asserting the rule
7
A case of that order would be uncommon. As the Carrier acknowl edges, “many of the cases reviewing ostensibly extra-statutory due proc ess objections could have been accommodated within the statutory frame work.” Brief for Petitioner 36. See also id.,
at 37 (“The statutory review provisions are plainly generous enough to permit litigants to raise all of the simple, common, easily adjudicated, and likely to be meritorious claims that sail under the flag of due process of la w.... ” ) .
82 UNION PACIFIC R. CO.
v.
LOCOMOTIVE ENGINEERS
Opinion of the Court waits too long to raise the point.” Kontrick v.
Ryan,
U.
S. 443, 456 (2004).
For example, we have held nonjurisdictional and forfeit- able the provision in Title VII of the Civil Rights Act of 1964, 42 U. S. C. § 2000e et
seq.,
requiring complainants to file a timely charge of discrimination with the Equal Employ ment Opportunity Commission (EEOC) before proceeding to court.
Zipes v.
Trans World Airlines, Inc.,
455 U. S. 385,
393 (1982). We have also held nonjurisdictional and forfeit- able the Title VII provision exempting employers who en gage fewer than 15 employees.
Arbaugh,
546 U. S., at 503, 515–516. And we have determined that a Chapter 7 trust ee’s (or creditor’s) limited time to object to the debtor’s dis charge, see Fed. Rule Bkrtcy. Proc. 4004, is a claim- processing, not a jurisdictional, matter.
Kontrick,
540 U. S.,
at 446–447, 460. In contrast, relying on a long line of this Court’s decisions left undisturbed by Congress, we have re affirmed the jurisdictional character of the time limitation for filing a notice of appeal stated in 28 U. S. C. § 2107(a).
Russell, 551 U. S. 205, 209–211 (2007). See also John
R.
552 U. S. 130,
132 (2008) (court must consider sua sponte
timeliness of law suit filed against the United States in the Court of Federal Claims).
With these decisions in mind, we turn back to the require ment that parties to minor disputes, as a last chance prearbi tration, attempt settlement “in conference,” 45 U. S. C. § 152 Second, Sixth. See supra,
at 73–74, and n. 3. This obliga tion is imposed on carriers and grievants alike but, we hold, its satisfaction does not condition the adjudicatory authority of the Board.
The Board’s jurisdiction extends to “all disputes between carriers and their employees ‘growing out of grievances or out of the interpretation or application of agreements con cerning rates of pay, rules, or working condition s.... ’ ”
Cite as: 558 U. S. 67 (2009)
83
Opinion of the Court Slocum v.
Delaware,
L.
&
W .
R.
Co.,
339 U. S. 239, 240 (1950)
(quoting § 153 First (i)). True, the RLA instructs that, be fore any reference to arbitration, the dispute “shall be han dled in the usual manner up to and including the [designated] chief operating officer.” § 153 First (i). And when the CBA’s grievance procedure has not been followed, resort to the Board would ordinarily be objectionable as premature.
The additional requirement of a conference, we note, is in dependent of the CBA process. Rather, the conference re quirement is stated in the “[g]eneral duties” section of the RLA, § 152, a section that is not moored to the “[e]stablish ment[, ]... powers[,] and duties” of the NRAB set out next in § 153 First. Rooted in § 152 and often informal in prac tice, see supra,
at 73–74, conferencing is surely no more “ju risdictional” than is the presuit resort to the EEOC held forfeitable in Zipes,
455 U. S., at 393.
8
And if the require ment to conference is not “jurisdictional,” then failure ini tially to submit proof of conferencing cannot be of that genre.
See Part III–B, infra.
In defense of the Board’s characterization of conferencing and proof thereof as jurisdictional, the Carrier points to the NRAB’s Circular One procedural regulations, see supra,
at 73, which provide: “No petition shall be considered by any division of the Board unless the subject matter has been han dled in accordance with the provisions of the [RLA].” 29 CFR § 301.2(b). But that provision, as other prescriptions in Circular One, is a claim-processing rule. Congress gave
8
The RLA states, in § 152 First, a general duty “to settle all disputes,” and, in § 152 Second, a more specific duty to “conference.” These provi sions apply to all disputes in the railroad industry, major as well as minor.
They also apply to disputes in the airline industry, over which the NRAB has no jurisdiction. § 181. Neither provision “speak[s] in jurisdictional terms or refer[s] in any way to the jurisdiction of the” NRAB.
Zipes v.
Trans World Airlines, Inc.
, 455 U. S. 385, 394 (1982).
84 UNION PACIFIC R. CO.
v.
LOCOMOTIVE ENGINEERS
Opinion of the Court the Board no authority to adopt rules of jurisdictional di mension. See 45 U. S. C. § 153 First (v) (authorizing the NRAB to “adopt such rules as it deems necessary to control proceedings before the respective divisions and not in con flict with the provisions of this section”). And when the fact of conferencing is genuinely contested, we see no reason why the panel could not adjourn the proceeding pending cure of any lapse. Circular One does not exclude such a sensible solution.
The Carrier cites NRAB decisions that allegedly support characterization of conferencing as jurisdictional. If the NRAB lacks authority to define the jurisdiction of its panels, however, surely the panels themselves lack that authority.
Furthermore, NRAB panels have variously addressed the matter. For example, in NRAB Third Div. Award No. 15880 (Oct. 26, 1967), the panel, although characterizing the confer encing requirement as “jurisdictional,” said that “[i]f one of the parties refuses or fails to avail itself of a conference where there is an opportunity to do so, it cannot then assert the defense of a lack of jurisdiction.” Id.,
at 2. See also NRAB Fourth Div. Award No. 5074 (June 21, 2001) (same); NRAB Third Div. Award No. 28147 (Oct. 16, 1989) (same).
Cf.
Arbaugh,
546 U. S., at 511 (“unrefined” uses of the word “jurisdiction” are entitled to “no precedential effect” (inter nal quotation marks omitted)). And in NRAB First Div.
Award No. 23867, p. 5 (Apr. 7, 1988), the panel observed that the ordinary remedy for lack of conferencing is to “dismiss th[e] claim without prejudice to allow Claimant to cure the jurisdictional defect.” That panel reached the merits never theless.
Ibid.
Cf.
Steel Co.,
523 U. S., at 94 (“Jurisdiction is power to declare the law, and when it ceases to exist, the only function remaining to the [tribunal] is that of announc ing the fact and dismissing the cause.” (quoting Ex
parte McCardle,
7 Wall. 506, 514 (1869))). We note, in addition, the acknowledgment of the Carrier’s counsel that, if confer
Cite as: 558 U. S. 67 (2009)
85
Opinion of the Court encing has not occurred, NRAB panels have stayed arbitra tion to allow the parties to confer. Tr. of Oral Arg. 10, 22.
9
B
The RLA provides that, when on-property proceedings do not yield settlement, both parties or either party may refer the case to the Board “with a full statement of the facts and all supporting data bearing upon the disputes.” § 153 First (i). Circular One correspondingly instructs employees seeking Board adjudication “[to] set forth all relevant, argu mentative facts” and “affirmatively show the same to have been presented to the carrier and made a part of the particu lar question in dispute.” 29 CFR § 301.5(d); see § 301.5(e) (similar instruction addressed to carriers). Conferencing, the Carrier urged, is a “relevant, argumentative fac[t],” so proof thereof must accompany party submissions.
As earlier explained, see supra,
at 83–84, instructions on party submissions—essentially pleading instructions—are claim-processing, not jurisdictional, rules. Moreover, the Board itself has recognized that conferencing may not be a “question in dispute.” It has counseled parties submitting joint exhibits “to omit documents that are unimportant and/or irrelevant to the disposition of the [case]; for exam ple . . . letters requesting a conference (assuming that is not
an issue in the dispute).” NRAB Instructions Sheet, Joint Exh. Program, p. 5 (July 1, 2003), online at http://www. nmb.gov/arbitration/nrab-instruc.pdf (as visited Dec. 3, 2009,
9
While holding that the panel did not lack jurisdiction over the employ ees’ claims, we recognize the Board’s authority to adopt claim-processing rules backed by effective sanctions. See supra,
at 73; cf. Fed. Rule Civ. Proc. 37(b)(2) (specifying sanctions, including dismissal, for failure to comply with discovery orders); Rule 41(b) (authorizing involuntary dismissal for failure to prosecute or to comply with rules of procedure or court orders). We also recognize that NRAB panels, in managing in dividual arbitrations, may prescribe and enforce reasonable procedural requirements.
86 UNION PACIFIC R. CO.
v.
LOCOMOTIVE ENGINEERS
Opinion of the Court and in Clerk of Court’s case file). It bears repetition here that neither the Union nor the Carrier, in its submissions to the Board, identified conferencing as a “question in dispute.” See supra,
at 76.
It makes sense to exclude at the arbitration stage newly presented “data . . . in support of [the] employee[’s] [griev ance],” 29 CFR § 301.5(d)—evidence the carrier had no op portunity to consider prearbitration. A contrary rule would sandbag the carrier. But conferencing is not a fact bearing on the merits of a grievance. Indeed, there may be no dis agreement at all about the occurrence of conferencing, as the Union believed to be the case here. Moreover, the RLA re spects the right of the parties to order for themselves the conference procedures they will follow. See 45 U. S. C. § 152 Sixth (“[N]othing in this chapter shall be construed to super sede the provisions of any agreement (as to conferences) . . . in effect between the parties.”). In sum, neither the RLA nor Circular One could plausibly be read to require, as a pre requisite to the NRAB’s exercise of jurisdiction, submission of proof of conferencing.
* * * By refusing to adjudicate cases on the false premise that it lacked power to hear them, the NRAB panel failed “to conform, or confine itself,” to the jurisdiction Congress gave it. We therefore affirm the judgment of the Court of Ap peals for the Seventh Circuit.
It is so ordered.